Railway applications - Urban guided transport management and command/control systems - Part 3: System requirements specification (IEC 62290-3:2019)
This part of IEC 62290 specifies the system architecture for Urban Guided Transport
Management and Command/Control systems (UGTMS) as defined in IEC 62290-1 and
IEC 62290-2, and the allocation of functions and requirements defined in IEC 62290-2 to the
different UGTMS subsystems (designated as system constituents in IEC 62290-1 and
IEC 62290-2), for use in urban guided passenger transport lines and networks.
This document is applicable for new lines or for upgrading existing signalling and command
control systems.
This document is applicable to applications using:
• continuous data transmission
• continuous supervision of train movements by train protection profile
• localisation by reporting trains, and optionally by external wayside equipment for nonreporting
ones (e.g. in case of mixed operation or degraded operation)
This document is not applicable to existing command and control systems or projects in
progress prior to the effective date of this document.
ΚΩΔΙΚΟΣ ΠΡΟΪΟΝΤΟΣ:
CYS EN IEC 62290-3:2019
This part of IEC 62290 specifies the system architecture for Urban Guided Transport
Management and Command/Control systems (UGTMS) as defined in IEC 62290-1 and
IEC 62290-2, and the allocation of functions and requirements defined in IEC 62290-2 to the
different UGTMS subsystems (designated as system constituents in IEC 62290-1 and
IEC 62290-2), for use in urban guided passenger transport lines and networks.
This document is applicable for new lines or for upgrading existing signalling and command
control systems.
This document is applicable to applications using:
• continuous data transmission
• continuous supervision of train movements by train protection profile
• localisation by reporting trains, and optionally by external wayside equipment for nonreporting
ones (e.g. in case of mixed operation or degraded operation)
This document is not applicable to existing command and control systems or projects in
progress prior to the effective date of this document.